ARCH 371 JUNIOR DESIGN STUDIO PROJECT 1: GALLERY CAFÉ (15 points)
The Gallery Café integrates the work of local artists into a coffee shop in downtown Champaign. Your proposals will occupy the ground level and must be linked to outdoor space (the proportion of indoor and outdoor space might vary between proposals). The surrounding built environment and the Gallery Café must interact and ensure a spontaneous flow of space.
Assigned: Monday, August 23 Due: Friday September 3 at 1 pm (5-minute digital presentation)
PROGRAM
Main Entry/Lobby: 300 SF
Restaurant-Space/ Seating Area: 1000 SF
Bar/Counter Area: 500 SF
Kitchen: 500 SF
Toilets (gender neutral, at least 1 ADA): 200 SF
Exhibition Space Allocation/Display: Varies
Outdoor Space/Seating Area: Varies
SITES
You’ll be using the site from Exercise 4 in your sophomore year. Please refer to your analysis from that course for this proposal.
DELIVERABLES
Site documentation: Photos, sketches, and diagrams from your site visit; you can include analysis work from your sophomore year as well
Site map: aerial satellite image of your site with diagrammatic analysis overlaid in Illustrator (11x17, color; all sites to be represented at the same scale)
Floor plan of intervention and immediate context (1/16” = 1’)
One elevation of intervention and immediate context (1/8” = 1’)
One section of intervention and immediate context (1/8” = 1’)
Two perspective collages (can be hybrid hand drawing/digital montage); be precise about scale and materiality
Digital presentation (see INDD guide below)
RESOURCES
11 x 17 Base Images (Google Earth): Download PDF
JPEG file of site map base (greyscale): Download JPEG
JPEG files of individual sites: Site 1 Site 2 Site 3 Site 4 Site 5 Site 6
CAD tutorial on importing site images and sketches: Watch on Illinois MediaSpace (requires an Illinois net id login)
Drawing examples: Download PDF
ADA bathroom layout guides: Link
Commercial kitchen layout guides: Link
InDesign presentation guide: Download INDD file
SCHEDULE
Monday August 23: Introduction, site visit
Wednesday August 25: Concept sketches due, desk crits
Friday August 27: Submit draft site cartography and floor plan on Box, 5PM (PDF files); receive markups Saturday
Monday August 30: In-progress plans due, desk crits
Wednesday September 1: In-progress section and elevation due, desk crits
Friday September 3: Project 1 review (Zoom and ConceptBoard links forthcoming)
REVIEW: FRIDAY SEPTEMBER 3, 2021
Zoom link (sign in at 1PM; review begins at 1:30), Meeting ID: 829 8449 9171 and Password: 795812
Concept Board link (images must be uploaded by 1PM)